U.S.:       (316) 828-5110
    Europe:  +39-035-2273411
    Asia:       +81-3-5435-8560
KG-TOWER SOFTWARE
FAQ
Home Our Company Products and Services Applications Literature Data Sheets
CASE STUDIES
TECHNICAL ARTICLES
PRODUCT BROCHURES

Koch-Glitsch Contact Information
We have provided a partial listing of documents available by request below. If you are interested in a Koch-Glitsch document that is not listed, please contact your local sales manager.

All documents require Adobe Acrobat Reader, available as a free download from Adobe.com

Increased Capacity and Greater Efficiency in Benzene and Toulene towers - Project Report 111

SUPERFRAC® Trays Help Increase FCCU Capacity - Project Report 117

Gas Plant Deisobutanizer Experiences 20% Capacity Increase - Project Report 120

Analysis & Correction of Alky Deisobutanizer's Design Flaws - Project Report 220

Multiple Benefits Stemming from Sieve Tray Revamp to High Capacity Fixed Valve Trays - Project Report 225

Glycol Contactor Structured packing Reduces Capitol Cost and Improves Capacity - Project Report 230

C2 Splitter Successfully Revamped with Superfrac® Trays for Increased Capacity - Project Report 235

Ethylene Quench Tower Modifications Exceed Revamp Requirements - Project Report 240

NGL Deethanizer Capacity Expansion Achieved by Using High Capacity ULTRA-FRAC® Trays - Project Report 245 

ULTRA-FRAC® Trays Increase Tower Capacity by More Than 50% - Project Report 250

High-Capacity Trays Increase Debutanizer Capacity - Project Report 255

Increase Run Time of an AN Heads Column Using SUPERFLUX® Trays - Project Report 265

Efficiency Increase for H2S Extraction with SMVP™ Extraction Packing - Project Report 270

Revamp of a Heavy Aromatics Fractionator - Project Report 275

Revamping an Ethylene Unit Demethanizer with Packings - Project Report 104
Request This Case Study

Revamping an Acid Gas Removal Unit with Random Packing - Project Report 109
Request This Case Study

Cleaning up Contaminated Ground Water with a Centrifugal Air Stripping Unit - Project Report 110
Request This Case Study

Increased Tertiary Butyl Alcohol Capacity - Project Report 112
Request This Case Study

SUPERFRAC® Trays Combine with GEMPAK® Packing for an Overall 25% Capacity Increase - Project Report 122
Request This Case Study

SUPERFLUX® Tray Virtually Eliminates Plugging Problem - Project Report 123
Request This Case Study

Modular Hydrogen unit Enables Refinery to Meet Clean Air Act Diesel Spec in 12 Months - Project Report 124
Request This Case Study

Analysis & Recommended Operating Changes Increase Vacuum Tower's LVGO Production by 33% - Project Report 129
Request This Case Study

Troubleshooting Analysis Corrects Lube Column Fractionation Problems - Project Report 130
Request This Case Study

Analysis and Correction of Deisobutanizer Design Flaws Increases Capacity by 15% - Project Report 131
Request This Case Study

One-Month Revamp Using GEMPAK® Structured Packing Yields 5.5% More Vacuum Gas Oil & Better Quality Product - Project Report 133
Request This Case Study

Complete Crude Unit Revamp in 19 Days - Project Report 134
Request This Case Study

Combination of GEMPAK® Packing and BALLAST® Trays Increases Capacity, Improves Fractionation - Project Report 135
Request This Case Study

Proper Design Corrects Packed FCCU Fractionator - Project Report 136
Request This Case Study

Non-Condensible Vacuum Tower Gas Problems Solved by Sweet-Vac System - Project Report 137
Request This Case Study

Refiner Reduces Benzene in Reformate by 60% - Project Report 139
Request This Case Study

High-Capacity Trays Provide Savings for Heavy Liquid Load Service - Project Report 140
Request This Case Study

Customer and Supplier Partner for Capacity Solution Using FLEXIMAX® Random Packing - Project Report 200
Request This Case Study

Turnkey Approach Provides Total Solution - Project Report 201
Request This Case Study

Amine Contacting With Liquid Hydrocarbons - Project Report 205
Request This Case Study

Removing Acetonitrile from MTBE Feed - Project Report 210
Request This Case Study

Methanol Removal in a MTBE Facility - Project Report 215
Request This Case Study





© Copyright 2008 Koch-Glitsch, LP
Terms of Use | Privacy Policy